Ventilated Facade M.E.A Training Center

PROJECT DESCRIPTION

Training complex for future pilots and administrative headquarters of M.E.A.. The complex was completed at the end of 2016.

LOCATION

Beirut, Lebanon

CONSTRUCTION DATES

2015 – 2016

APPROXIMATE SURFACE

6.000 m²

COVERING

Compact porcelain tile 12 mm thick, 800X800 mm format

SB SYSTEM USED

Sistema Compact Ceramic System – 25/0380 – Hidden

TECHNICAL DESCRIPTION

The ventilated facade system is composed of:

  • Aluminum support and retention brackets (brackets or separators) for the transmission of loads from the
  • substructure to the original self-supporting structure using anchors.
  • Anchoring the brackets or brackets to the support using stainless steel screws.
  • Ventilated air chamber and 50 mm rock wool thermal insulation
  • Vertical T and L profiles, attached to brackets by means of stainless steel self-tapping screws.
  • Staples for fixing the exterior covering to the vertical profiles using self-drilling hexagonal head screws
  • Exterior covering of Roca Brand Porcelanica plate of 800 x 800 x 12
  • The covering is fixed to the vertical profiles using hidden fixing stainless steel staples and polyurethane adhesive.
  • Metal fencing for windows and doors in epoxy painted sheet metal
CONTACT US

Are you looking for a company to carry out your ventilated facade project?

REQUEST A QUOTE